Andre,

Gordon and his offsider were able to install the new switchboard and mains on Tuesday this week in conjunction with Tas Networks and Metering Dynamics. Everything is working OK and it is good to see that the old board has gone.

I have found the new Meter to be very user friendly as it can show the current/wattage for each Tariff. Simple matter to check say each heat pump in turn by switching the other Tariff 41 circuit breakers off.

Very satisfied with both heat pumps this morning – obviously there has not been a large temperature change required.

I am very impressed with the standard of workmanship for both the Heat Pump and Switchboard installation. It is a credit to those involved.

So, thank you very much.